Specifications

Reinforcement

GBR/ARUN/ARS/ ISTEEL FE 500/550 TMT

Cement

ZUARI/Coromandel/ ULTRATECH OPC for concrete and PPC for major masonry and plastering work.

Windows With Grill

Upvc windows with cast iron safety grills will be fixed.

Bricks

Flyash bricks and wire-cut bricks will be used AAC blocks will be used wherever needed to reduce load.

Plumbing Fittings And Connections

Star or finolex cpvc pipes and f ittings will be used throughout the building.

Concrete Mix

M20/25 (1:1.5:3) will be mixed and used for various reinforced concrete elements in the building structure. More clear details will be attached with the structural plan.

Bathroom Tiles And Door

2ft*1ft vertified wall and anti-skid floor tiles will be used in all the bathrooms in the building. Premium quality WPC doors with frames will be fixed.

Common Area Tiles

Anti-skid rough texture tiles will be used of size 1ft*1ft for all the common areas, staircase and verandah.

Sand

Msand will be used for mortar and Rsand will be used for plastering full building inner & outer.

Electrical Fittings

Orbit/finolex/ polycab wires & Anchor roma fittings (switches,wires,sockets etc)

Bathroom Frames & Doors

WPC frame with flush door will be used including frame/labor/painting.

Painting Works

Tractor emulsion 2 coats of (Asian paints, patty and whitecement) will be layered.

Main-door & Frames & Bedroom Frames & Doors

Teak wood 1st quality will be used including frame & labor & fixing & painting. Teak wood 2nd quality will be used including frame & labor & fixing & painting.

Bathroom Fittings

Parryware bathroom and sanitaryware Fittings, Closets, Basin, Taps, Wall mixture (all models will be intimated to the client and after the approval it will be purchased and installed)

Location Benefits

Bank Partners

Schedule of Payments
Booking Advance 5%
Documentation Work 5%
On Registration / Construction Agreement 40%
Sale DEED After Brickwork 10%
After Plastering & Plumbing 10%
After Tiles & Painting 15%
After Carpenter & Fittings 10%
Before Handover 5%
  • Registration Charges
  • Legal Fees, Documentation Charges and Incidental Expenses
  • GST
  • Solar Panel Charges
  • Miscellaneous Charges
  • Service Connection Charges, Fees, Deposits and Incidental Expenses For Electricity, Water Supply and Drainage Connection
  • Government Fees, Charges & Incidentals